The control layer for EV charging

Control the charging moment. Protect the business outcome.

Vampire.Energy is designed to connect charger behaviour, operational requirements and energy signals around the outcome the business needs.

Why the layer matters

Charging is no longer a device problem.

Electrification connects mobility, electrical infrastructure and business operations. The decision of when energy moves now affects availability, capacity, cost and the customer relationship.

Control ownership

The operating outcome should determine who can intervene, under which rules and with what evidence.

01

Online is not the same as successful.

Authentication, energy delivery, metering, billing and the surrounding workflow can still fail.

02

Power is not the same as mobility.

The right vehicle needs the right energy by the time the operating plan requires it—not simply as soon as it plugs in.

03

Energy signals need physical context.

Price, solar and flexibility signals only matter inside the limits of the vehicle, charger, site and customer requirement.

04

The business needs evidence of the result.

Every action should be traceable from charger state to operational and commercial completion.

One connected operating model

From charger truth to business control.

The platform preserves the context required to observe, decide, act and verify across every charging session.

01

Charger truth

Capability, firmware, metering, vehicle response and current state.

02

Operational control

Policies, configuration, session actions and verified recovery paths.

03

Business workflows

Fleet, property, customer, billing, roaming and ERP handoffs.

04

Energy intelligence

Capacity, schedules, tariffs, renewables and external system signals.

Explore the platform architecture arrow_forward

Vampire.Energy’s ISO 15118-20 software was tested live with Keysight equipment on AC hardware provided by Astreea. Review the engineering evidence ↗

Define where charging control belongs in your business.

Start with the outcome, infrastructure and systems already in place, then define what a credible first deployment needs to prove.

Discuss your deployment arrow_forward